Dust-free Workshop Engineering

  • Dust-free Plant Installation

    Dust-free Plant Installation

    Clean room requirements:

    1. Constant temperature and humidity clean room, temperature should be controlled at 22 °C ± 2, humidity is 55% ± 5

    2. Anti-static in the purification workshop

    3. Structural requirements: rock wool color steel plate partition, glass magnesium color steel plate ceiling

    Email Details
  • Clean Room Engineering

    Clean Room Engineering

    The main function of the clean room is to control the cleanliness and temperature and humidity of the atmosphere in contact with the product, so that the product can be produced and manufactured in a good environment.

    The clean room installation project includes three stages of clean room design, engineering construction and operation management methods.

    Email Details
  • 1,000 Class Clean Room Installtion

    1,000 Class Clean Room Installtion

    1000 Class clean room means: no more than 1000 dust particles per cubic foot or more

    The 1000 Class clean room is flexible and flexible, and is suitable for installation in new plants, as well as for purification technology of old dust-free workshops. The maintenance structure can also be arbitrarily combined with the process requirements, and the disassembly is convenient.

    The clean room needs a small auxiliary building area and low requirements for earth building renovation.

    The clean room airflow organization is flexible and reasonable, and can meet the needs of various working environments and different cleanliness levels.

    Email Details
  • Dust-free Room Installtion Engineering

    Dust-free Room Installtion Engineering

    Dust-free Room installation engineering refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow velocity and airflow distribution, noise vibration and lighting The static electricity is controlled within a certain demand range, and the specially designed room is given. That is to say, no matter how the external air conditions change, the interior can have the characteristics of maintaining the cleanliness, temperature, humidity and pressure originally set.

    Email Details
  • Dust-free Room Installtion

    Dust-free Room Installtion

    Level requirement

    High cleanliness level, air volume, temperature, humidity, pressure difference, equipment exhaust are controlled as needed

    Wind speed controlled

    Illumination, clean room cross-section wind speed is controlled by design or specification.

    Static humidity

    The requirements for static electricity are extremely strict, especially for humidity.

    Planning and Design

    Clean production area; clean auxiliary room; management area; equipment area.

    Email Details
  • Cleanroom

    Cleanroom

    Clean room refers to the removal of pollutants in the air, harmful air, bacteria, etc. in a certain space, and the indoor temperature, cleanliness, indoor pressure, air flow velocity and air distribution, noise vibration and lighting, static electricity Controlled within a certain range of demand, and given a specially designed room.

    In the clean room, no matter how the external air conditions change, the indoors can have the characteristics of maintaining the cleanliness, temperature, humidity and pressure that were originally set.

    Email Details
  • 100 Class Clean Room Installtion

    100 Class Clean Room Installtion

    The main function of Class 100 clean room is indoor pollution control. Without clean room, it is impossible to mass produce contaminated parts.

      Class 100 clean room features

      Empty state: A clean room (facilities) that has been built and ready for use. It has all the relevant services and features. However, there are no equipment operated by the operator within the facility.

      Static: Various functions are complete, the settings are properly installed, and the clean room (facilities) that can be used or in use according to the settings, but there are no operators in the facility.

      Dynamic: The clean room is in normal use, the service function is perfect, there are equipment and personnel; if necessary, can carry out normal work.

    Email Details
  • Clean Room Engineering Installation

    Clean Room Engineering Installation

    Electrical and mechanical level-three, electrical power level-four, special pipeline GC2, decoration level-two
    28 years rich construction experience
    20 millions registered fund, 2000 enterprises service experience, 200 professional technical team
    There is no worry for you if you trust us and cooperate with us!
    Electrical and mechanical level-three, electrical power level-four, special pipeline GC2, decoration level-two

    Email Details
  • Clean Workshop

    Clean Workshop

    Electrical and mechanical level-three, electrical power level-four, special pipeline GC2, decoration level-two
    28 years rich construction experience
    20 millions registered fund, 2000 enterprises service experience, 200 professional technical team
    There is no worry for you if you trust us and cooperate with us!
    Electrical and mechanical level-three, electrical power level-four, special pipeline GC2, decoration level-two

    Email Details

Vietnam Shenfeng Electromechanical Co., Ltd. is mainly engaged in the installation of Dust-free Plant workshop,cleaning and finishing of Class 100 and Class 1000 clean rooms,low engineering price,high construction quality and high efficiency.

Get the latest price? We'll respond as soon as possible(within 12 hours)